Castle mold
Scope
TOTAL SQFT: 15,180 SF
Insulation: Double-layer fiberglass with clear poly vapor barrier on BSW
Roof Poly: Clear poly installed to underside of roof purlins using double-sided tape
Wall Poly: Clear poly installed on inside face of wall girts using double-sided tape
Liner Panels:
Full-height 29 GA PBR wall liner panels with trim
29 GA PBR ceiling liner panels with trim
Doors: (3) 3’-0” x 7’-0” pre-assembled walk doors with trim kits
Gutters & Downspouts: Included
IMP Conditions:
4” wall IMPs at FSW and LEW of main building
4” wall IMPs at LEW, FSW, and BSW of 30’ x 6’ bump-out building
Framed Openings: (15) field-located framed openings at IMP locations
-
From moisture control and insulation systems to precise liner panel installation and IMP coordination, we executed a complex scope efficiently while maintaining quality and consistency. Clients should consider us for our proven capability to manage specialized interior scopes, adapt to field conditions, and deliver durable, professional results.
-
Weather is a reality in steel erection, and this project is a strong example of how we manage it. Despite active snowfall during erection, our crews maintained productivity through proper planning, experienced supervision, and safe cold-weather work practices. This project demonstrates our ability to perform reliably even in challenging weather conditions.